EA5 · sprint 2026_S13 · build —
| Run | 20260703-092324-EA5-full-cit |
|---|---|
| Campaign | Full CIT |
| Sprint | 2026_S13 |
| Unit / model | EA5 / laser |
| Build | — |
| Operator | Richard |
| Status | finished |
| Started | 2026-07-03T09:23:24+00:00 |
6 fail 6 na 8 pass 20 skip
| ID | Element | Verdict | Note | Ticket |
|---|---|---|---|---|
| FW-4 | Latest FW is used | FAIL | fail | — |
| INT-13 | Test recovery closed loop | FAIL | — | |
| INT-5 | Reach Double Compass | FAIL | — | |
| MCT-6 | sanity check | FAIL | — | |
| SW-5 | Release image loading | FAIL | fail | — |
| VI-1 | Test vision connectivity | FAIL | (early-finish) | — |
| INT-12 | Test recovery open loop | PASS | — | |
| INT-2 | Advanced end effector rotation | PASS | — | |
| INT-6 | Reach Rover | PASS | — | |
| INT-7 | Stop motion | PASS | — | |
| INT-8 | Resume motion | PASS | — | |
| MCT-5 | Temperature monitoring (CPU + motherboard) | PASS | — | |
| NET-1 | Robot wifi works | PASS | blabla1 | — |
| NET-4 | Steamdeck can be turned on | PASS | https://app.clickup.com/4570305/v/b/4bf61-79795 | |
| INT-4 | Reach Single Compass | NA | — | |
| INT-9 | Test Gripper | NA | — | |
| MCN-1 | Backbone integrity | NA | — | |
| MCN-3 | Mechanical assembly integrity | NA | — | |
| MCN-4 | Mechanical assembly tightness | NA | — | |
| MOT-1 | MPC can be started | NA | — | |
| INT-1 | Basic end effector rotation | SKIP | — | |
| INT-3 | Valve opening | SKIP | — | |
| MCT-1 | Robot can be turned on from any ON/OFF button | SKIP | (early-finish) | — |
| MCT-2 | Robot can be turned off | SKIP | (early-finish) | — |
| MCT-3 | Robot can charge | SKIP | https://app.clickup.com/4570305/v/b/4bf61-79795 | |
| MCT-4 | Robot can go alone | SKIP | (early-finish) | — |
| MOT-10 | Kinematic Calibration | SKIP | (early-finish) | — |
| MOT-2 | Elbows down / Elbows up | SKIP | (early-finish) | — |
| MOT-3 | Elbows down / Elbows up | SKIP | (early-finish) | — |
| MOT-4 | Roll around | SKIP | (early-finish) | — |
| MOT-5 | Posturing | SKIP | (early-finish) | — |
| MOT-6 | Rolling below an obstacle | SKIP | (early-finish) | — |
| MOT-7 | Ground adaptation. | SKIP | (early-finish) | — |
| MOT-8 | Walking gait (with rolling) | SKIP | (early-finish) | — |
| MOT-9 | Walking Mode | SKIP | (early-finish) | — |
| NET-2 | Robot wifi connection | SKIP | — | |
| NET-3 | SSH connection to the motion PC | SKIP | sans pass | — |
| NET-5 | Robot modules access via their hostnames | SKIP | (early-finish) | — |
| NET-6 | Commander works | SKIP | (early-finish) | — |
| VI-2 | Test autonomous rover | SKIP | (early-finish) | — |