Run report — Full CIT Run: 20260703-120417-EA3-full-cit Sprint: 2026_S14 Unit: EA3 / sprinkler Build: - Operator: Test Status: finished Started: 2026-07-03T12:04:17+00:00 Summary: 3 fail, 4 na, 4 pass, 34 skip Results: [FAIL ] MCT-5 Temperature monitoring (CPU + motherboard) [FAIL ] MCT-6 sanity check [FAIL ] NET-1 Robot wifi works — fail [PASS ] INT-1 Basic end effector rotation [PASS ] INT-2 Advanced end effector rotation [PASS ] MCT-3 Robot can charge [PASS ] NET-3 SSH connection to the motion PC [NA ] FW-4 Latest FW is used [ticket: https://app.clickup.com/4570305/v/b/4bf61-79795 ] [NA ] INT-9 Test Gripper [NA ] MCN-3 Mechanical assembly integrity [NA ] MCN-4 Mechanical assembly tightness [SKIP ] INT-12 Test recovery open loop — (early-finish) [SKIP ] INT-13 Test recovery closed loop — (early-finish) [SKIP ] INT-3 Valve opening — (early-finish) [SKIP ] INT-4 Reach Single Compass — (early-finish) [SKIP ] INT-5 Reach Double Compass — (early-finish) [SKIP ] INT-6 Reach Rover — (early-finish) [SKIP ] INT-7 Stop motion — (early-finish) [SKIP ] INT-8 Resume motion — (early-finish) [SKIP ] MCN-1 Backbone integrity — (early-finish) [SKIP ] MCT-1 Robot can be turned on from any ON/OFF button — (early-finish) [SKIP ] MCT-2 Robot can be turned off — (early-finish) [SKIP ] MCT-4 Robot can go alone — (early-finish) [SKIP ] MOT-1 MPC can be started — (early-finish) [SKIP ] MOT-10 Kinematic Calibration — (early-finish) [SKIP ] MOT-11 stress the Posturing — (early-finish) [SKIP ] MOT-2 Elbows down / Elbows up — (early-finish) [SKIP ] MOT-3 Elbows down / Elbows up — (early-finish) [SKIP ] MOT-4 Roll around — (early-finish) [SKIP ] MOT-5 Posturing — (early-finish) [SKIP ] MOT-6 Rolling below an obstacle — (early-finish) [SKIP ] MOT-7 Ground adaptation. — (early-finish) [SKIP ] MOT-8 Walking gait (with rolling) — (early-finish) [SKIP ] MOT-9 Walking Mode — (early-finish) [SKIP ] NET-2 Robot wifi connection — (early-finish) [SKIP ] NET-4 Steamdeck can be turned on — (early-finish) [SKIP ] NET-5 Robot modules access via their hostnames — (early-finish) [SKIP ] NET-6 Commander works — (early-finish) [SKIP ] NET-7 Radio Mesh — (early-finish) [SKIP ] NET-8 Robot can control without internet access in the vision pc — (early-finish) [SKIP ] SW-5 Release image loading — sans pass [SKIP ] VI-1 Test vision connectivity — (early-finish) [SKIP ] VI-2 Test autonomous rover — (early-finish) [SKIP ] VI-3 Climbing on an obstacle — (early-finish) [SKIP ] VI-4 Stepping over an obstable — (early-finish)