Run report — Full CIT Run: 20260708-122114-EA3-full-cit Sprint: 2026_S14 Unit: EA3 / base Build: main-b3ff0b94c Operator: Anais Status: finished Started: 2026-07-08T12:21:14+00:00 Summary: 1 fail, 3 na, 32 pass, 8 skip Results: [FAIL ] MOT-7 Ground adaptation. — Shaking a lot with AGA [PASS ] FW-4 Latest FW is used [PASS ] INT-12 Test recovery open loop [PASS ] INT-13 Test recovery closed loop [PASS ] INT-4 Reach Single Compass [PASS ] INT-5 Reach Double Compass [PASS ] INT-6 Reach Rover [PASS ] INT-7 Stop motion [PASS ] INT-8 Resume motion [PASS ] MCN-1 Backbone integrity [PASS ] MCN-3 Mechanical assembly integrity [PASS ] MCN-4 Mechanical assembly tightness [PASS ] MCT-1 Robot can be turned on from any ON/OFF button [PASS ] MCT-2 Robot can be turned off [PASS ] MCT-3 Robot can charge [PASS ] MCT-4 Robot can go alone [PASS ] MCT-5 Temperature monitoring (CPU + motherboard) [PASS ] MCT-6 sanity check [PASS ] MOT-1 MPC can be started [PASS ] MOT-11 stress the Posturing [PASS ] MOT-2 Elbows down / Elbows up [PASS ] MOT-3 Elbows down / Elbows up [PASS ] MOT-4 Roll around [PASS ] MOT-5 Posturing [PASS ] MOT-8 Walking gait (with rolling) [PASS ] MOT-9 Walking Mode [PASS ] NET-1 Robot wifi works [PASS ] NET-2 Robot wifi connection [PASS ] NET-3 SSH connection to the motion PC [PASS ] NET-4 Steamdeck can be turned on [PASS ] NET-5 Robot modules access via their hostnames [PASS ] NET-6 Commander works [PASS ] SW-5 Release image loading [NA ] INT-1 Basic end effector rotation [NA ] INT-2 Advanced end effector rotation [NA ] INT-9 Test Gripper [SKIP ] FW-5 CPU Load & Thermal Control Test — (early-finish) [SKIP ] MOT-10 Kinematic Calibration — (early-finish) [SKIP ] MOT-6 Rolling below an obstacle [SKIP ] NET-7 Radio Mesh — (early-finish) [SKIP ] NET-8 Robot can control without internet access in the vision pc — (early-finish) [SKIP ] NET-9 Disc Pressure Stress Test — (early-finish) [SKIP ] VI-1 Test vision connectivity — (early-finish) [SKIP ] VI-2 Test autonomous rover — (early-finish)