Run report — Full CIT Run: 20260710-160336-EA5-full-cit Sprint: 2026_S14 Unit: EA5 / base Build: main-22d33ce0e Operator: Cheikh Status: finished Started: 2026-07-10T16:03:36+00:00 Summary: 2 fail, 2 na, 25 pass, 1 skip Results: [FAIL ] INT-6 Reach Rover — found also in EA7 [ticket: https://app.clickup.com/t/4570305/86canre3z ] [FAIL ] MOT-1 MPC can be started [ticket: https://app.clickup.com/t/4570305/86canrx57 ] [PASS ] INT-8 Resume motion [PASS ] MCN-1 Backbone integrity [PASS ] MCN-3 Mechanical assembly integrity [PASS ] MCN-4 Mechanical assembly tightness [PASS ] MCT-1 Robot can be turned on from any ON/OFF button [PASS ] MCT-2 Robot can be turned off [PASS ] MCT-3 Robot can charge [PASS ] MCT-4 Robot can go alone [PASS ] MCT-5 Temperature monitoring (CPU + motherboard) [PASS ] MCT-6 sanity check [PASS ] MOT-11 stress the Posturing [PASS ] MOT-2 Elbows down / Elbows up [PASS ] MOT-3 Elbows down / Elbows up [PASS ] MOT-4 Roll around [PASS ] MOT-5 Posturing [PASS ] NET-1 Robot wifi works [PASS ] NET-2 Robot wifi connection [PASS ] NET-3 SSH connection to the motion PC [PASS ] NET-4 Steamdeck can be turned on [PASS ] NET-5 Robot modules access via their hostnames [PASS ] NET-6 Commander works [PASS ] NET-8 Robot can control without internet access in the vision pc [PASS ] SW-5 Release image loading [PASS ] VI-1 Test vision connectivity [PASS ] VI-2 Test autonomous rover [NA ] INT-7 Stop motion [NA ] INT-9 Test Gripper [SKIP ] NET-7 Radio Mesh