Run report — Full CIT · EA5
20260805-163546-EA5-full-cit · sprint 2026_S16 · build main-92fa9f751c · operator Cheikh · status finished
8 fail 1 na 33 pass 4 skip
| ID | Element | Verdict | Note & evidence | Ticket |
|---|---|---|---|---|
| INT-12 | Test recovery open loop | fail | [CIT]EA5 S15 loop connector cannot close properly : mechanical issue | |
| INT-4 | Reach Single Compass | fail | https://app.clickup.com/t/4570305/86caxf3u5 | |
| INT-5 | Reach Double Compass | fail | https://app.clickup.com/t/4570305/86caxf3u5 | |
| MCT-3 | Robot can charge | fail | https://app.clickup.com/t/4570305/86cb0nkfu | |
| MCT-6 | sanity check | fail | https://app.clickup.com/t/4570305/86cb1kmvc | |
| MOT-1 | MPC can be started | fail | https://app.clickup.com/t/4570305/86canrx57 | |
| MOT-12 | Rolling in single compass | fail | https://app.clickup.com/t/4570305/86caxf3u5 | |
| VI-1 | Test vision connectivity | fail | https://app.clickup.com/t/4570305/86cb1ey9z | |
| FW-4 | Latest FW is used | pass | — | |
| FW-5 | CPU Load & Thermal Control Test | pass | — | |
| INT-13 | Test recovery closed loop | pass | — | |
| INT-6 | Reach Rover | pass | — | |
| INT-7 | Stop motion | pass | — | |
| INT-8 | Resume motion | pass | — | |
| MCN-1 | Backbone integrity | pass | — | |
| MCN-3 | Mechanical assembly integrity | pass | — | |
| MCN-4 | Mechanical assembly tightness | pass | — | |
| MCT-1 | Robot can be turned on from any ON/OFF button | pass | — | |
| MCT-2 | Robot can be turned off | pass | — | |
| MCT-4 | Robot can go alone | pass | — | |
| MCT-5 | Temperature monitoring (CPU + motherboard) | pass | — | |
| MOT-11 | stress the Posturing | pass | — | |
| MOT-13 | lift each wheel and landing | pass | — | |
| MOT-2 | Elbows down / Elbows up | pass | — | |
| MOT-3 | Elbows down / Elbows up | pass | — | |
| MOT-4 | Roll around | pass | — | |
| MOT-5 | Posturing | pass | — | |
| MOT-8 | Walking gait (with rolling) | pass | — | |
| MOT-9 | Walking Mode | pass | — | |
| NET-1 | Robot wifi works | pass | — | |
| NET-10 | Robot command restart & launchfiles load without internet (vision PC) | pass | — | |
| NET-2 | Robot wifi connection | pass | — | |
| NET-3 | SSH connection to the motion PC | pass | — | |
| NET-4 | Steamdeck can be turned on | pass | — | |
| NET-5 | Robot modules access via their hostnames | pass | — | |
| NET-6 | Commander works | pass | — | |
| NET-8 | Robot can control without internet access in the vision pc | pass | — | |
| NET-9 | Disc Pressure Stress Test | pass | — | |
| SW-5 | Release image loading | pass | — | |
| SW-6 | Check disk/image state | pass | — | |
| VI-2 | Test autonomous rover | pass | — | |
| INT-3 | Valve opening | na | — | |
| INT-1 | Basic end effector rotation | skip | — | |
| INT-2 | Advanced end effector rotation | skip | — | |
| SW-7 | Fill image store with a fake large image, then watch GC | skip | — | |
| VI-4 | Stepping over an obstable | skip | — |